New Construction – Under Stucco

DB Mist Systems will install mist line under the stucco during the framing stages of new builds or re-models. The atomizing line (mist line) is hidden from view with only the nozzles exposed, creating a seamlessly integrated appearance.

Materials typically used for pre-build applications are:

  • 3/8” O.D. 316L stainless steel atomizing and supply lines rated to 3000 psi
  • 316L stainless steel, double ferrule compression fittings rated to 3000 psi
  • 316L stainless steel clamps; rubber coated to absorb vibration
Installation procedures include:

  • Blue print, construction site and/or framing stage estimates
  • Atomizing and supply line installation PRIOR to lathe and scaffolding
  • Completion of system AFTER water and power are available at pump location
We require our contractors to provide the following:

  • Power – 110v or 220v dedicated circuit with outlet at pump location
  • On/Off Switch – Normally placed on patio next to light and ceiling fan switches
  • Water – Half inch (½”) threaded ball valve at pump location (soft water preferred)
  • Notification – Any addition of concrete, pavers or landscaping between the pump location and the patio will require PVC sleeves